Spillage Mats
Fitted to the box front platform to stop ore overflowing onto the cross cut footwall.

How it works
Eziload's spillage mat is attached to the box front platform and hangs into the hopper while the ore pass is being drained.
It prevents ore overflowing the hopper onto the footwall of the cross cut, so crews don't have to shovel spilled material back into a hopper after each pull.
Why crews choose it
- Eliminates hopper overflow spillage
- Saves shovelling labour after every pull
- Keeps cross cut clear for tramming
Image gallery
Related guides
Practical background from the Underground Water & Sludge Management Handbook.
Keeping working panels dry: water control at the face
Why water collects in working panels, what it costs in lost blasts and incidents, and how to move it off the face before it becomes a cleaning job.
Read →Spillage, slip and access safety around water
Wet footing and inclined access are a leading source of underground injuries. Practical controls for walkways, travelling ways and spillage points.
Read →Travelling ways and access in wet inclined workings
Designing and maintaining safe access where the ground is wet and the gradient changes — tread level, step consistency, drainage and inspection.
Read →Temporary support and props in wet, broken ground
Why wet ground behaves differently, what temporary support has to achieve, and how to install and inspect props where footwall and sidewall conditions deteriorate.
Read →Water, access and compliance: what an inspector looks for
A practical view of how water, spillage and access obligations are assessed underground, and how to make compliance a by-product of good operating practice.
Read →Related products
Adjustable Stairway
Level stairs on any gradient — engineered to eliminate slip-and-fall incidents in travelling ways.
View Adjustable Stairway details →Badger Temporary Support Prop
Patented temporary support prop removed remotely by pull cable — no one under the hangingwall.
View Badger Temporary Support Prop details →